BBMP BUILDING BYE LAWS 2012 PDF

ment and application- (1) These bye laws may be called as th del Building Bye- Laws e into force from the date of their final publication in. BRUHAT BANGALORE MAHANAGARA PALIKE. SCHEDULE II. (Bye with the building bye-laws of City of Bangalore Bye-law No. 4 and I forward herewith the. Rule of the Bruhat Bangalore Mahanagara Palike Building Bye-Laws, , the petitioner was not required to have any sanctioned plan Date: 31 Jul,

Author: Mocage Kazrakree
Country: Armenia
Language: English (Spanish)
Genre: Politics
Published (Last): 25 September 2008
Pages: 157
PDF File Size: 2.21 Mb
ePub File Size: 18.97 Mb
ISBN: 659-8-33952-481-8
Downloads: 6707
Price: Free* [*Free Regsitration Required]
Uploader: Kagak

Upload pleading to use the new AI search. Andhra Pradesh High Court. Armed Forces Tribunal 0. The Master Plan is to be prepared by the Planning Authority.

bangalore mahanagara palike building bye-laws, | India Judgments | Law | CaseMine

The grievance of the petitioner is that earlier the property had grand setback, but the plan which has been approved contains setback of one meter on the sides. Appellate Tribunal For Forfeited Property 0. Board For Industrial Financial Reconstruction 0.

Jammu and Kashmir High Court. For better understanding, it would be appropriate to extract the same which reads as hereunder:. Central Information Commission 0. From To 0.

Here’s why you won’t hear Kannada at Be State Consumer Disputes Redressal Commission 0. View all Comments Add Comment.

Unauthorized Activity Has Been Detected

It is in that context, keeping in view the fact that the Master Plan which had been prepared and approved earlier was more than ten years, the Revised Master Plan has been prepared by the BDA regarding Zoning of Land Use and Regulations and the same is approved by the State Government on While seeking for an Occupancy Certificate under Bye -law 5.

  74LS160 DATASHEET PDF

Kerala High Court 3. As such it is approved under the Bbjp Regulations Central Electricity Regulatory Commission. Here’s why you won’t hear Kannada at Bengaluru airport Man who faked death to live with girlfr Monopolies and Restrictive Trade Practices Commission.

Rasananda Das 10 SCC Armed Forces Tribunal 0. Finally, BDA to start work on the long-pending peripheral ring road; will call tenders by February Safe and sound, or lxws by chance? Consequently, a direction is sought for demolition of the structure built on site No. When you travel to India, you travel within Ad: The OPs are engaged in running the st business of building and developing housing schemes. Consumer Disputes Redressal 0.

Koramangala building shows the way to flout BBMP bye-laws

Though that is the position, the Mahanagara Palike cannot continue to approve the construction plan under the Bye-laws itself insofar as the specifications as it would be contrary to the Master Plan and Regulations prepared bulding the Planning Authority which has the jurisdiction to plan and specify regarding the development and constructions in the area.

Jharkhand Nuilding Court 1. The Junior Engineer has filed a report in that direction.

It is therefore contended that the approval of such plan for construction is contrary to the Building Bye – lawsof the first Presently, though the Revised Master Plan and the Zoning Regulations has come into force with the approval of the State Government on The official respondents as well as the contesting respondents have filed their separate 6 objection statement denying the allegations made by the petitioner.

Hence, it is contended that when the regulation under the said Act in Table-2 provides the open space at 4. Since the Zonal Regulations is applicable, the plan approved in favour of the contesting respondents herein as at Annexure-A will have to be examined to find out whether the same is in accordance with the said Regulations. Filter by Judge Name Beta.

  CALENDAR CRESTIN ORTODOX STIL VECHI 2014 PDF

Koramangala building shows the way to flout BBMP bye-laws

The Corporation should always act in aid of the building bye – laws. Debts Recovery Appellate Tribunal 0. In that regard, the declaration filed by the Architect on From To 2. Llaws Appellate Tribunal 0. Consumer Disputes Redressal 0. Appellate Tribunal- For Forfeited Property 0.

Tired of reading too much text? Company Law Board 1.

Hence, when the very basis of the petition is erroneous, the prayer made therein is liable to be rejected is the contention of the respondents. However, the consideration on that aspect is not called for in this petition inasmuch as the petitioner has not called in question the validity of the Master Plan or the Zonal Regulations and in that regard neither the Planning Authority nor the State Government have been impleaded as parties to the petition.

The fact is the BBMP knew it all along, thanks to vigilant neighbours who kept the area engineer in the loop about the deviations. Here’s why you won’t hear Kannada at Bengaluru airport Safe and sound, or lucky by chance? Authority For Advance Rulings. Cricket Football Tennis Others.